Revit bim model level of detail10/31/2023 The LOD is determined by the amount of data collected and the level of accuracy of that data. The level of development (LOD) in BIM describes the level of accuracy and detail of the model during the course of a project. As a means of ensuring quality in the process of building design and construction, it is currently being implemented by an increasing number of nations.Ĭreating and maintaining information about a building or infrastructure project digitally is called BIM (Building Information Modeling). Architects, engineers, and contractors all utilize it as the industry standard. The LOD standard serves as a benchmark for the 3D models' level of accuracy and detail. Variant standards have also been established in other nations with minor variations. These texts were accepted as reference resources by other nations, including Australia, Canada, Singapore, etc. The Building Information Modeling Protocol Exhibit first established the five-level notion of Stages of Development in 2008. At that time, they employed a method that was similar to a LOD to link digital models to project costs. With the information in those papers, it is possible to date the earliest LOD usage to 2004 by a business that develops software for construction analysis. Speaking about the Level of Development (LOD) a number of old articles provide an excellent summary of the development and history of LOD.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |